肥白大屁股bbwbbwhd,在线视频 亚太 国产 欧美 一区二区,免费网站看sm调教视频,国产无av码在线观看

AC source power & DC source power manufacturing factory

Calculating method of alarm current

As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
the following are introduced separately:

One:Single-phase power supply
Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

Two: Three-phase power supply
The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
主站蜘蛛池模板: 亚洲另类春色国产精品| 少妇激情一区二区三区视频 | 国产亲子乱A片免费视频| 国内精品久久久久久99| 亚洲精品www久久久久久| 九九综合va免费看| 巨人精品福利官方导航| 一个人在线观看免费视频www| 久久天天躁狠狠躁夜夜躁2014| 校花用?揉我| 国模无码一区二区三区不卡| 色欲久久久中文字幕综合网| 毛片在线播放a| 成年女人免费碰碰视频| 18黑白丝水手服自慰喷水网站| 国产中文字幕乱人伦在线观看| 亚洲日本乱码中文在线电影| 国内精品伊人久久久久7777| 亚洲一区二区三区含羞草| 97久久草草超级碰碰碰| 国产成人av片无码免费| 久久永久免费人妻精品我不卡 | 最新精品国偷自产在线婷婷| 国产无遮挡吃胸膜奶免费看| 色狠狠av一区二区三区| 被窝的午夜无码福利专区| 韩产日产国产欧产| 久久天天躁狠狠躁夜夜| 亚洲中文无码永久免费| 国产精品久久一区二区三区| 日本大乳高潮视频在线观看| 久久久久无码精品国产人妻无码| 亚洲欧美日韩国产国产a| 亚洲色欲网熟女少妇| 免费视频成人片在线观看| 国产特黄级aaaaa片免| 午夜理论片yy6080私人影院| 国产av熟女一区二区三区| 国产一区二区不卡在线看| 人妻中文无码久热丝袜| 日本做受高潮好舒服视频|